Design Integration explored the redevelopment of an industrial building on Floodgate Street, Deritend, Birmingham. The project combined spatial planning, lighting strategy, material selection, and technical detailing into a fully resolved interior proposal. The scheme integrates showroom, workshop and collaborative workspaces within an adaptive reuse framework.